Candidate Handbook

Opening the Mountain

Use these checklists when opening Chairs 3 and 4

Opening Chair 3

Opening Chair 4

  • Set up lift safety rope at the bottom of Chair 2
  • Set up lift safety rope at the bottom of Chair 3
  • Set up SLOW signs in gulch
  • Set up two SLOW signs wehre Robins and Skyline merge at Chair 3
  • Make sure operators are at top and bottom of Chair 2 and Chair 3
  • Set up and mark up information signs at top and bottom of Chair 3
  • Mark closed trails as directed
  • Make closed markers are visible and secure
  • Check at the top of Chair 3 for:
    • At least one full 02 tank
    • Non-rebreather mask and cannula
    • Backboard
    • C-collars (all 5 sizes)
    • Complete packs on each toboggan
    • Operational toboggans (check pins, ropes, break)
    • Lift evacuation kit (T-bar and rope)
    • Ensure that the operator completes opening:
      • Safeties
      • Ramps
      • Signs
      • Ropes for lines
  • Set up lift safety rope at the bottom of Chair 4
  • Make sure operators are at top and bottom of Chair 4
  • Set up Chair 4 lift safet rope
  • Check under chair for clearance
  • Mark closed trails as directed
  • Make closed markers are visible and secure
  • Check at the top of Chair 3 for:
    • At least one full 02 tank
    • Non-rebreather mask and cannula
    • Backboard
    • C-collars (all 5 sizes)
    • Complete packs on each toboggan
    • Operational toboggans (check pins, ropes, break)
    • Lift evacuation kit (T-bar and rope)
    • Ensure that the operator completes opening:
      • Safeties
      • Ramps
      • Signs
      • Ropes for lines